Overview: Unlike previous projects undertaken by Glenfield Engineering, the chilled water pump skids were a workshop based project with minimal time spent on site.

Project Aims: To complete the project on time, within budget, safely and to a high quality standard

Project Status: Project complete

With the majority of the scope being completed in our workshop it enabled the project team to successfully meet the project aims.

Project Duration: 8 weeks

Work Scope: The mechanical scope of work comprised of the fabrication, installation & testing of Carbon Steel pipework ranging from 0.5” to 10”. The scope also included the procurement, fabrication and painting of the skid framework.

Project Description:

  • Awarded the mechanical contract September 2015
  • Procurement of material for framework and issue drawings for fabrication
  • Produce fabrication drawing using Cadworx Pant
  • Issue of prioritised fabrication drawings to the workshop
  • Install pipework and in-line items on the skid frame incl. phenolic blocks & U-Bolts
  • Pneumatic testing of completed pipework
  • Delivery to site via our flatbed truck, offloading and installing using heavy lifting

 

 